Implementing Cisco Catalyst SD-WAN Solutions (300-415 ENSDWI) Exam Materials-Question 76 Discussion
Comment Image Comment Image Comment Image

What is the next step when the WAN Edge device boots up and resolves the domain in the ZTP process for WAN Edge deployment? (Choose one answer)

  • A. The WAN Edge device establishes secure control plane connections with the controllers and secure data plane connections in the SD-WAN overlay network.
  • B. The WAN Edge router authenticates to the vBond orchestrator with the chassis serial number and root certificate.
  • C. The WAN Edge device learns the vBond and organization name from the configuration and initiates a secure control connection to the vBond orchestrator.
  • D. The WAN Edge device establishes secure connections with the vManage and vSmart and downloads the configuration using NETCONF.
Correct Answer: B

Brave-Dump Clients Votes

C 100%

Comments



Diego Coronel 2026-09-17 23:20:07

Selected Answers: C


For me, first is C, and second is B